For prosthodontists
tooth 16- overlay with prservation of the contact point
August 11, 2025
tooth 1.6- overlay without opening of the distal contact point
September 18, 2025
2.1 subsequent prosthetic treatment after the trauma
March 23, 2025
2.1 - reparation of the venner
January 27, 2026
2.1 - preparation for the orthodontic treatment
March 23, 2025
14-24 preparation for the veneers+ retarction
October 30, 2025
14 FULL CROWN
October 18, 2025
13+23 veneer 360
December 2, 2025
12, 12, 23 preparation retarction, temporary restarations
February 27, 2026
11, 21, 22 full crowns
January 10, 2026
11, 21 veneers on refractory die, mock up, preparation, retraction
January 10, 2026
11-21 full zirconia crowns
July 28, 2025
11- veneer, 21- 3/4 crown, 22- full crown + retraction and impression
November 17, 2025
1.7 preparation, making of the provisional crown
March 23, 2025
1.7 overlay with covering of the bucal surface
March 23, 2025
1.7 -OVERLAY.
March 23, 2025
1.6-removal of the zirconia crown
June 19, 2025
1.6 overlay without opening of the distal contact point.
November 7, 2025
1.5 -preparation, temporary crown modelling
March 23, 2025
1.3, 1.2, 1.1, 2.1, 2.2, 2.3 VENEERS + CROWNS
June 9, 2025
1.1, 2.1 3/4 EMAX CROWNS
June 26, 2025
1.1 full crowm tooth 2.1 venner, closing of diastema
March 23, 2025